Enterprise Asset Management and ISO 55001
Asset registers, lifecycle planning and ISO 55001 frameworks. The record of what an owner actually holds, built to survive the contractor who handed it over.
The problem
Most owners do not know what they own. The register is a spreadsheet inherited from a consultant, the valuations predate two handovers, and the O and M contract is priced against assets nobody has verified. Every year of delay makes the reconstruction more expensive.
How the engagement runs
- 01
ISO 55001 gap analysis, asset management policy and strategic asset management plan
- 02
Fixed asset register construction, verification and valuation aligned to IFRS and IVS
- 03
GIS based digital twin programmes and spatial asset registers
- 04
Lifecycle cost planning and renewal profiling
- 05
O and M contract transition and performance based contracting under ISO 44001
What you receive
ISO 55001 gap analysis and conformance roadmap
Verified fixed asset register with valuation basis
Strategic asset management plan and lifecycle model
Digital twin and GIS register specification
Commissioning this work
Engagements are scoped against the programme, the contract form and the current cost position. Send those three things and you will get a written view on scope and duration before any fee is discussed.
Request a scoping call