The practice

Built by someonewho ran the sitebefore auditing it.

Project Advisors is an independent capital projects practice. It acts for owners only, which removes the conflict that arises when the same firm advises both sides of a construction contract.

Base
Riyadh, Saudi Arabia
Coverage
Gulf and Levant
Acting for
Owners, ministries, authorities, investors

Why it exists

Construction audit is usually done by accountants who have never stood on a site, or by engineers who have never tested a payment application. The gap between those two positions is where owners lose money.

The practice was founded to close it. The work is deliberately narrow: capital programmes, owner side, in a region where the scale of investment has outrun the governance built to control it.

Client identities are never published. Every engagement reference on this site is described by portfolio value, sector and scope, and nothing else. In this field that discretion is the product, not a courtesy.

The record in figures

$0B+

Infrastructure portfolios under advisory governance

$0M+

Infrastructure delivered on site as a construction engineer

0M sqm

Fixed asset registers built and verified

0+ yrs

Across heavy civil construction and Big Four advisory

Founding principal

Ihab Elayan

B.E. (Civil), CCA

Credentials

  • CCA, Certified Construction Auditor
  • CCP, Construction Control Professional
  • B.E. Civil Engineering, Jordan University of Science and Technology

Languages

Arabic, English

Career record

2013 to present

Director, Big Four advisory practice

Saudi Arabia
  • Built and holds commercial accountability for an enterprise asset management practice, scaling its contribution roughly fifteen times since its first mandate.
  • Architected an asset management model for a ministry level authority that grew from a single municipal mandate into a GIS based digital twin programme adopted as a national RFP standard.
  • Directed enterprise wide risk based internal audit programmes across finance, development, PMO, engineering and design functions for tier one organisations.
  • Led asset governance mandates across five government entities under the national cash to accrual transformation programme.
  • Reviewed project execution and contractual compliance across a SAR 4B+ portfolio for a sovereign fund subsidiary.
  • Established an engineering audit framework for a municipality running a SAR 4.3B portfolio spanning roads, tunnels, sanitation and PMO.
  • Verified and valued more than 50,000 assets and SAR 4B of real estate against IFRS and IVS.
  • Directed a confidential forensic investigation for a shareholder in a multi billion riyal contracting group.
2009 to 2013

Bridges Superintendent

Jubail, Saudi Arabia
  • Supervised civil construction for ten major bridges under Royal Commission contracts, directing a workforce of 240.
  • Delivered the Riyadh Second Ring Road southern leg, seven interchanges and bridge systems valued at SAR 559M.
  • Held drawing approval, shop drawing and execution coordination across SAR 450M of infrastructure.
2006 to 2009

Civil and Project Engineer

Jordan
  • Led infrastructure works for a USD 114M cement plant, covering culverts, earthworks and roads.
  • Oversaw downtown development construction involving excavation volumes above 500,000 cubic metres.
  • Managed utility and road relocation across multi utility networks on a major coastal development.

The record above is the founding principal’s professional history. It is presented as individual career experience and not as engagements of Project Advisors. All client identities are withheld.

Three commitments,held without exception.

01

Owner side only

The practice does not act for contractors, and does not accept an engagement where it has advised the counterparty on the same programme. Independence stops meaning anything the moment it is qualified.

02

Findings stated plainly

Reports state a position and rate its severity. Where the evidence does not support a finding, the report says so. An audit that only confirms what the sponsor hoped to read has no value to anyone.

03

Absolute confidentiality

No client is named, no engagement is published, no case study is written. What appears on this site is technical writing on the discipline itself, never on the work.

Bring the programme.We will tell you where the exposure is.

Contact the practice